Water & Wastewater Project Experience

We specialize in wastewater and water plant construction in Florida, led by a licensed PE and GC, delivering durable infrastructure and compliant systems.

About

About our projects

Working Dog Contractors has extensive experience working within water and wastewater treatment facilities throughout Florida. At Tampa Bay Water, the company completed the installation of slide gates, while at the City of Mount Dora’s wastewater facility, the team successfully diagnosed and repaired a complex piece of treatment equipment. These projects highlight the company’s ability to tackle specialized infrastructure needs with practical, reliable solutions.

Client Testimonials

A photographic close-up of a labeled stainless steel manifold system in a water treatment facility, featuring multiple flanged pipes, precision valves, pressure gauges, and flow meters arranged in a logical, organized layout. Each component has clear, engraved or printed labels, indicating line IDs and flow directions, reinforcing professionalism and code compliance. Overhead industrial LED lighting casts bright, even illumination, creating soft metallic highlights and minimal shadows. The background shows a clean, painted masonry wall and neatly routed conduit. The mood is technical, meticulous, and trustworthy. Captured straight-on with a medium focal length to minimize distortion, using a shallow depth of field that keeps the central manifold crisp while gently softening peripheral elements, resulting in a modern, documentation-ready photographic realism image.

Hope D.

From project kickoff to final inspections, this team delivered on time, stayed compliant, and kept our costs under control.

A highly detailed photographic view of a newly constructed concrete clarifier tank at a Florida water plant, filled with calm, reflective water. The circular tank features a sturdy stainless steel peripheral walkway, evenly spaced guardrails, and a central rotating sludge collection mechanism with exposed beams and skimmer arms. Overhead, bright, clear midday sunlight creates strong, crisp reflections on the water surface and subtle highlights on metal components. The background shows a flat horizon with palm trees, low utility buildings, and a blue sky with a few clouds. The mood is clean, precise, and reassuringly engineered. Captured at eye level with a slight diagonal composition along the walkway, maintaining sharp focus to show textures of concrete, steel, and water in photographic realism.

Hope D.

Their licensed engineers understood our site constraints and navigated Tampa permitting with minimal disruption to operations.